What’s Next for Mississippi Drive?

The Mississippi Drive Corridor – A complete street addressing walkability, connectivity, aesthetics, and all modes of transportation! A new gateway project for Muscatine.

City of Muscatine

BZ_MuscatineIA_After

After the public engagement meetings for Mississippi Drive back in September and November of last year, you may be asking, what’s next? Well, here’s some more information about next steps for the Mississippi Drive Corridor Project.

The next public engagement meeting is scheduled for:

Tuesday, June 21 at 6 p.m.

Riverview Center, 110 Harbor Drive

The meeting will serve as the introduction of preliminary plans for the project that were created by the engineering team based on community input and polling at the last two meetings.

Join us to see design plans and provide feedback as we work toward a shared vision for using Mississippi Drive to connect the Muscatine community!

For more information about the project, see the our engineering team Bolton and Menk’s Mississippi Drive website.

View original post

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s