Mississippi Drive Corridor Project: A complete streets project and signature entryway into the City of Muscatine!
The City of Muscatine, Iowa, is soliciting qualifications from interested engineering firms to provide design services and other related work for the “Mississippi Drive Corridor Reconstruction Project”. This proposal includes the reconstruction of 1.6 miles of U.S. 61-Business (pavement and curb/gutter); street lighting, landscaping, gateway features; pedestrian crossings and sidewalk improvements; traffic signals and geometric improvements; and storm drainage improvements and roadway embankment work intended to improve flood protection. The work would focus on four distinct areas adjoining Muscatine’s Central Business District. The improvement segments include the HNI Campus Area, Downtown Area, High Sidewalk (Bluff) Area and the Carver Corner Area. The objectives for the proposal include meeting the objectives of Muscatine’s complete street policy by improving both Muscatine’s quality of life and image by providing a safe and attractive environment for street users of all ages and abilities such as motorists, pedestrians, bicyclists, mass transit, children, senior citizens, individuals with disabilities, freight carriers, emergency responders and adjacent land users; modernizing U.S. 61-Business through the reconfiguration and reconstruction of the sub-standard, deteriorated roadway; and enhancing aesthetics throughout the corridor that are consistent with Muscatine’s riverfront improvements. Work will include plan development, public meetings, design development, final design, technical specifications and drawings.
Mississippi Drive Corridor Project Request for Qualifications (RFQ)
The following resources provide further background information, technical data, and the potential vision for the Mississippi Drive Corridor Project. These resources can be found at the following link: http://www.muscatineiowa.gov/941/Mississippi-Drive-Corridor-ProjectMississippi Drive Corridor Study
- Corridor Alignment and Geometric Alternative Analysis
- Traffic Analysis Geometric Alternative
- IA 92 Pavement History Map
- Mississippi Riverfront Study June 1997
- Vision for Mississippi Drive
- Comprehensive Plan
- Complete Street Policy
The City is currently in the process of selecting an engineering firm to bring this project from concept to reality.
Our first step will be to engage the community, its residents and key stakeholders in a formal public process.
Mississippi Drive Today

Mississippi Drive Tomorrow?

These images were prepared for Muscatine by Dan Burden and the Blue Zones Team. “Dan Burden provides a framework and action plan for communities to change their environments into safe, walkable, bike-able and livable communities where individuals and businesses thrive.” (http://www.bluezones.com/walkability-3/)
For more information on Blue Zones, Dan Buettner, and Dan Burden’s efforts please see the following link: http://www.bluezones.com
Stayed tuned for more information and please participate!
41.422655
-91.045186
Like this:
Like Loading...